Hose pump news and technology > Foamed concrete hose pump > Professional English for hydraulic engineering

Professional English for hydraulic engineering

Foamed concrete hose pump 2021-07-22 08:48 69
South to north water diversion project south to north water diversion project south to north water diversion project south to north water diversion project south to north water diversion project south to north water diversion project south to north water diversion project south to north water diversion project south to north water diversion project south to north water diversion project south to North Water diversion project south to north water diversion project south to north water diversion project south to north water diversion project south to north water diversion project south to north water diversion project south to North Water Diversion Project Water treatment project sewage treatment plant drainage network drainage ecological shelter forest Flood control project diversion dike training wall infrastructure road net flood control prevent control flood anabranch drop river course compound cross section on-site concrete precast concrete seepage prevention structure schematic diagram However, in the green belt Wetland / marsh, the rubber dam bulkhead gate, the emergency gate and the emergency gate, The frequency converter of the frame crane gantry crane for the maintenance gate was parallel flowdirection along the water flow direction and vertical to the water flow direction; Setting retarder service gate service gate stoplog gate submerged gate self collapsing gate draft tube gate backwater gate, As built drawing of 8-ton self-propelled vibrating roller, Bid for blasting cap detonator borehole borehole borrow yard catchment catchment area closestool toilet wall alveolar culvert dam base width elevation, Free drainage free flow generator gevr = gross enriched vibrating RCC abnormal concrete Bar, handrail, breast wall rear elevation, Small backhoe soil sub contractor switching station tipping trucks truck groutmixer mixer weathered release agent segment gate radial gate overflow gate overflow gate jet gate minute progressmeeting minutes Cl The total price of lump sum, which corresponds to the unit price project, is the owner of truss client. Sometimes, the employer is seldom used, and the consultant is usually used for design consultation, Fault fault bench rebar refers to reinforced bar, while bar refers to reinforced bar, admixture, additive, workability of concrete binder concrete diversion tunnel saddle dam packer test - water pressure test Lugeon value is the main parameter of curtain grouting inverted siphon siphoncul Aqueduct aqueduct chainage residual distance (R.D.) pile No. groutmix mixed grout take concrete solidification, curing test fill rolling test seepage failure seepage failure sliding failure foundation pit joint joint (Geology), joint (Design) hose earth dam. It can also be used as a gravel paved road of levee (dyke) main canal distributary canal, It is not the metal pavement, but the contractor, the joint venture, the emergency spillway, the uncontrolled crest spillway, the tailrace dam and the conveyor plan, Plan issued approval description draw coordinate point coordinate point of excavation weir Valley Canyon stockpiling berm road adit backfill intake intake high intake slope intake deck platform yard, Permanent chilled water stress concentration mixing plant compressed air plant air compressor pumped storage power plant workshop of Pumped Storage Power Station Diesel engine in bulk oil depot switching station switch Station Camp Camp Camp restaurant Park parking lot growing grouting organization crane trash rack outline, If the reservoir water level is above the dam crest. It's not in the dictionary. Overhead traveling crane bulkhead gate Trashracks trash rack guardrail safety margin aggregate reserve earthfill, rockfill, concrete, riprap, RCC (roller compacted concrete) filling water control project, Hydraulic project - earth dam of borrow area quarry of hydropower project, sometimes for earth dike allocation, approval, authorization, authorization, Bill quantities, bill quantity, bill quantity, bill quantity, bill quantity contract, General conditions, special conditions, special conditions, civil engineering construction, civil engineering construction contract, construction management consultant, consultant contract agreement, contractor cooperation, Cooperation, coordination, cost control, cost control, counterclaim, delay, demobilization, exit department, Department designer, designer drawing, shop drawing, workshop drawing, design drawing, as built drawing, completion drawing, blue drawing, transparent drawing, construction drawing, Construction drawing, electrical works, employer (client owner), engineer's representative, engineer's representative, engineering project, international project, overseas project, overseas project, equipment, equipment, equipment, foreign staff, expert, export, Federation civil engineering contractor, Formal, formal hydro mechanical works, import of metal structure engineering, import of charge of, in charge of, informal, informal institution Civil Engineers (ice), Institute of civil engineers, instrument, instrument insurance, insurance labor, labor layout, layout leading company, leading company, Liability (responsibility, visibility), responsibility, obligation, lump sum, general contractor, machine, mechanical power, human resource manufacturer, manufacturer, material, material, material measure, method, measure, effective measure, Against payment, payment plant, equipment point view (option), viewpoint, opinion, prequalification, prequalification, procurement, profit progress control, progress control, project manager, quality control, quality control request (application), application, requirement review, risk, risk river closure, River diversion, safety, safety, signature, site engineer, site engineer, specification, specification, staff, subcontractor, submission, supervision, monitoring, supplier, International Chamber of Commerce, International Chamber of Commerce unit price, unit price variation (change), World Bank, world bank, open excavation bench excavation, bench excavation, concrete excavation, concrete excavation, fault excavation, fault excavation, foundation excavation, local excavation of foundation, mass (bulk) excavation of partial excavation, protective layer excavation of large area and rock excavation of protective layer are changed, Slope excavation, soft ground excavation, soft foundation excavation, structural excavation, structural excavation, tooth excavation, unclassified material excavation, non classified excavation, coefficient of non-uniformity, cutting trench dewatering (drainage), Drainage excavation pit, excavation intensity excavation, over excavation (overbreak), over excavation pump pump, under excavation (underbreak), under excavation treatment, under excavation treatment, tunnel excavation and underground excavation, one excavation cycle, adit, adit, advance depth, Cutting hole, caving hole, cushion hole, bottom hole, bottom hole, center hole, side hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, bottom hole, bottom hole, bottom hole, bottom hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, top hole, bottom hole, bottom hole, bottom hole, bottom hole, bottom hole, bottom hole, bottom hole, bottom hole, bottom hole, bottom hole, bottom hole, bottom hole, bottom hole, bottom hole, Head bench excavation, heading and bench excavation, loading hauling muck (mucking), loading (charging), perimeter hole, pilot tunnel, pilot tunnel removal, dust removal, ground water removal, shooting explosive (blasting), blasting, top heading excavation, Excavation of upper pilot tunnel, drilling blasting, abandoned hole, average hole depth, average quantity used unit volume, average unit consumption, blasting result, blasting result, blockness, controlled perimeter blasting, peripheral controlled blasting, data explosively filled, charging parameter data holesdriven, Drilling parameters delayed blasting
Tag:Professional,English,for,hydra